This is removal of goods destined to other countries through Zimbabwe. These goods do not pay duty as we have a bond with ZMRA for that. These goods are expected to make exit within three days failure to which ZIMRA will assume goods have been consumed in the country and duties waived at time of importation will be called for or the bond on those goods will be called –up.